
- Home
- Bathroom Remodeling
Bathroom Remodeling in Manteca
Failing shower tile, water-damaged vanities and fixtures that drip no matter how hard you turn the handle, replaced down to the framing.
How does Henle Construction remodel a bathroom?
Old tile, backer board, vanity and flooring come out down to the subfloor and framing. Damaged framing is replaced, new cement board goes into the wet areas and is waterproofed with a membrane before any tile is set. Wall tile goes first, then flooring, then the vanity and fixtures. A full bathroom typically takes three to five weeks.
- Typical length
- 3 to 5 weeks
- Projects start at
- $15,000
- Wet areas
- Cement board plus waterproof membrane
- Warranty
- 1 year on labor
What we see before most bathroom remodels
Grout that has broken down behind the shower walls. Vanity cabinets with swollen particleboard under the sink. A tub surround where the caulk has pulled away from the wall, or a floor that feels soft near the toilet flange. These are moisture problems, and patching the surface does not stop them.
A Henle bathroom remodel replaces the shower, tile, flooring, vanity and fixtures so the room works again and looks current. Walls are opened and inspected for water damage, and any compromised framing or subfloor is replaced before the new surfaces go on.


What sits behind your new shower tile
Tap a layer to see what it does. This is the order every Henle shower is built in, from the framing out.
Framing
Walls are opened and inspected for water damage. Any compromised framing is replaced before anything new goes on.
Water that got past the old tile shows up here first, as stains, soft wood or mold.
Cement board
New cement board is installed over the studs in every wet area to give the tile a stable, moisture-resistant base.
Drywall or old backer board in a shower is what lets tile crack and walls rot.
Waterproof membrane
The cement board is waterproofed with a membrane before any tile is set.
Tile is not waterproof on its own. The membrane is what keeps water away from the framing and subfloor.
Thinset mortar
Tile is set in thinset mortar with full coverage, starting from the center of the most visible wall.
Thin coverage under the tile is a common reason grout cracks later.
Tile
Porcelain absorbs less water than ceramic, and rectified edges allow tighter grout joints that are easier to keep clean.
Laying out from the center of the main wall puts the cut pieces in the less visible corners.
Grout and sealer
Shower grout is sealed after curing, or epoxy grout is used so there is no ongoing sealer to apply.
Caulk joints at the tub and wall are smoothed and tooled so they shed water.
It was from a small dungeon looking shower and 1960s wallpaper to a very open, much bigger and fresh looking bathroom.
Materials picked for daily use and moisture
Porcelain tile absorbs less water than ceramic, and rectified edges allow tighter grout joints that are easier to keep clean. Shower grout is sealed after it cures, or epoxy grout is used so there is no ongoing sealer to apply. Vanity cabinets are built with plywood boxes instead of particleboard so they resist swelling if water reaches the inside.
When the work is finished, tile sits flat with no lips between pieces, grout lines are straight and even, and caulk joints at the tub and wall are smooth and tooled to shed water. Faucets do not drip, the toilet sits level and does not rock, and vanity drawers glide without binding.


What this service covers
Included
- Shower and tub surrounds
- Tile on walls and floors
- Flooring
- Vanity cabinets
- Fixture replacement
- Framing and subfloor repair found during demolition
Not included: Structural changes that enlarge the bathroom footprint, Stand-alone tile repair outside a remodel, Drain or supply relocation without permit approval.
How Henle writes a bathroom into the estimate
These line items come straight from Henle's bathroom estimates and invoices in Tracy, Manteca, Lathrop and Stockton.
Mold and water resistant drywall
Shower and tub surrounds get water resistant sheetrock, or cement board where tile is going on the walls.
RedGard on the shower walls
Walls are waterproofed with a RedGard barrier before solid surface panels or tile go up.
Mortar-bed shower pans
Custom pans are framed, floated with deck mud to slope toward the drain, waterproofed and tiled. Acrylic pans are set in a mortar bed.
Drains moved to center
When a pan gets larger, the slab is jackhammered to center the drain, and 1 1/2" tub drains are changed to 2" shower drains.
Recessed shampoo niches
Niches are framed between the studs, typically about 14" x 14", and tiled or lined with Piedrafina marble.
Frameless heavy glass doors
3/8" clear glass enclosures, frameless or bi-pass, with hardware in the finish you choose.
Every Henle estimate lists what is included line by line. Anything not listed is extra and is estimated before it is done.
Bathroom Remodeling questions from Manteca homeowners
Answers from Henle Construction. Have a question that is not here? Call Tom at (209) 914-1269.
How long does a bathroom remodel take?
A full bathroom renovation typically takes three to five weeks, depending on the size of the room, whether plumbing is relocated, and how long tile and fixture orders take to arrive.
Why is waterproofing needed if the walls are tiled?
Tile is not waterproof on its own. The membrane or backer board beneath it keeps water from reaching the framing and subfloor, where it causes rot and mold.
What does it mean if grout cracks after installation?
Grout cracks usually point to movement in the substrate or thin mortar coverage under the tile. The fix is removing and resetting that section over properly supported backer board.
What vanity works best in a small Manteca bathroom?
Wall-mounted vanities free up floor space and make cleaning easier, while pedestal sinks have minimal visual weight but give up storage.
Can you convert a bathtub to a walk-in shower?
Yes. Tub-to-shower conversions are part of our bathroom remodels, with the wet area rebuilt on cement board and a waterproof membrane before tile.
Often part of the same project
Ready to plan your remodel?
Call Tom directly or send a few details about your project. Estimates are free, and what is on the estimate is the only thing that will be done.



