White kitchen with a quartz island and a stainless pro range
  1. Home
  2. Countertop Installation
Henle Construction, Inc.

Countertop Installation for Kitchen and Bath Remodels

Quartz and granite templated from your installed cabinets, so the fit is tight even where the walls are not square.

Quick answer

Does Henle Construction install countertops on their own?

No. Countertops are installed as part of a kitchen or bathroom remodel that also includes cabinets, backsplash and fixture work. The template is made from the installed cabinets, the fabricator cuts and finishes the slab, and the counters are set on site with seams aligned and filled. Fabrication typically takes seven to fourteen days after templating.

Fabrication
7 to 14 days after templating
Materials
Quartz, granite, solid surface
Template
Made from installed cabinets
Offered
Within a remodel only
How the fit happens

Templated from the cabinets, not the old counter

You need new countertops when cabinets are replaced, the layout changes, or the existing surface is chipped, burned or delaminating at the edges. Installation starts only after the base cabinets are leveled and secured. The template uses the installed cabinets as its reference, capturing exact dimensions and any out-of-square corners.

Sink, cooktop and faucet cutouts are made during fabrication from those template measurements, which is why exact sink and cooktop model numbers are confirmed before templating. Once the counters are set, the backsplash tile goes in, fitted tight along the back edge.

Fireclay apron front sink with dark countertops and a bridge faucet
White kitchen remodel with a marble island and orb pendant lights
Fireclay apron front sink with dark countertops and a bridge faucet
Quartz or granite

Which countertop fits how you use the kitchen?

Pick what matters most to you to see which material fits and what to keep in mind.

Best fit

Quartz

Quartz resists staining and needs no periodic sealing.

Worth knowing

Keep in mind

Quartz can discolor under long, direct sunlight in very bright kitchens.

quartz countertops
Jan M. · Google reviewRead More Reviews
What you will notice

Even overhangs, tight seams, clean reveals

Finished counters overhang the cabinet face by the same margin all the way around. Seams are placed along cabinet joints or in less visible spots such as near the stove or along the back wall, then filled and polished. Edges carry one consistent profile, sink cutouts have even reveals, and faucet holes line up with the plumbing without strain.

Both quartz and granite resist scratching better than laminate and handle hot pans without scorching, though trivets are still recommended to avoid thermal shock.

White kitchen with a wood-top island and light wood floors
Kitchen with dark cabinets, white counters and a wall of windows
White kitchen with a wood-top island and light wood floors
Scope

What this service covers

Included

  • Material selection guidance
  • Field templating after cabinets are installed
  • Fabrication coordination
  • On-site fitting and seam work
  • Sink, cooktop and faucet cutouts

Not included: Countertop replacement on its own, outside a remodel, Cutouts without exact model dimensions.

From the job files

Countertop specs from Henle's job files

How counters are written up in Henle's kitchen and bath estimates.

Plywood sub-top first

A 5/8" plywood sub-top goes on the base cabinets before any slab is set.

Quartz slab of your choice

Fabricated quartz with a laminated front edge and a 4" or 6" backsplash.

Undermount sink cut-outs

Sink cut-outs made for undermount sinks, with the sink and faucet hooked up.

Supported overhangs

Metal bars recessed into the island carry the overhang without corbels.

Piedrafina vanity tops

Bathroom vanity tops in Piedrafina marble with a laminated edge and undermount porcelain sinks.

Backsplash outlets

Outlets and switches in the new backsplash replaced with new devices.

Every Henle estimate lists what is included line by line. Anything not listed is extra and is estimated before it is done.

FAQ

Countertop Installation questions from Manteca homeowners

Answers from Henle Construction. Have a question that is not here? Call Tom at (209) 914-1269.

Which countertop needs the least maintenance?

Quartz needs no sealing and resists staining better than granite or marble, though it can discolor under long, direct sunlight in very bright kitchens.

How often does granite need sealing?

Granite should be sealed every one to two years to keep porous areas from staining.

Why is templating done after the cabinets are installed?

Cabinets can shift slightly during installation and walls are rarely straight, so templating from the installed cabinets is what makes the counter fit without gaps.

What if the sink cutout does not match the sink?

A wrong cutout means refabrication or field modification, both of which delay the job, so exact sink model numbers are confirmed before templating.

How long does countertop fabrication take?

Fabrication typically takes seven to fourteen days after templating, depending on material availability and the fabricator's schedule.

Ready to plan your remodel?

Call Tom directly or send a few details about your project. Estimates are free, and what is on the estimate is the only thing that will be done.

Call (209) 914-1269Free Estimate